SigenStack Pilot Project Offer Extended Until September 2026

July 23, 2026

The link to this page has been copied.

Blue Sun Group is pleased to announce that the SigenStack Pilot Project Offer has officially been extended until 30 September 2026, providing installers and EPC partners with additional time to secure preferential pricing for their commercial energy storage projects.

The pilot program has been designed to support selected C&I projects that showcase the capabilities and value of commercial battery storage solutions. With increasing demand for commercial energy storage driven by rising energy costs, demand management opportunities, and evolving market incentives, the SigenStack Pilot Project Offer presents a valuable opportunity for industry partners to deliver secured, innovative, and cost-effective solutions for their customers.

Pilot Offer Overview

Participants in the pilot program will receive:

  • 25% OFF eligible SigenStack systems
  • Includes up to one commercial inverter and 21 battery modules
  • Available for one project per installer
  • Additional equipment outside the pilot offer scope will be supplied at standard pricing

Project Requirements

Eligible projects should:

  • Be suitable C&I applications with clear use cases such as demand reduction, load shifting, or site energy optimisation
  • Participate in a project case study or showcase to support industry education and awareness

Why SigenStack?

Designed specifically for commercial and industrial energy storage applications, SigenStack delivers industry-leading safety, flexibility, and ease of deployment.

Key benefits include:

  • Pack-level safety protection with precise thermal runaway control
  • Higher energy density, reducing footprint requirements and increasing site flexibility
  • IP66-rated design for reliable outdoor performance with simplified operation and maintenance
  • Pack-level active balancing, eliminating the need for on-site SOC calibration
  • Modular and stackable architecture for flexible system sizing and ultra-fast commissioning

Learn More

Download the SigenStack Product Brochure below to explore the system's features, technical specifications, and commercial energy storage capabilities.

SigenStack Product Brochure

Secure Your Project

The SigenStack Pilot Project Offer is available until 30 September 2026.

Discuss your upcoming commercial energy storage projects with the Blue Sun Group team to determine eligibility and take advantage of this exclusive pilot opportunity.

For more information or to register your interest, please email Blue Sun Group marketing team, or submit your project for assessment by completing the SigenStack Project form below.

marketing@bluesungroup.com.au

SigenStack Project Form

Further Reading

Check out more projects from Blue Sun Group below.
We are Ready to
Answer Your Questions
Fill Out Our Contact Form and
We Will Get Back to You As Soon As Possible.
* All Items Marked with an Asterisk Are Required.
LinkedIn Facebook Rednote Other
I Agree to the